A produtividade da mão de obra no sistema construtivo de parede de concreto in loco: estudo de caso utilizando forma metálica
| dc.contributor.advisor | Dorneles, Juliana Bonacorso | |
| dc.contributor.advisor-co | Beck, Luciana Mota | |
| dc.contributor.advisor-coLattes | http://lattes.cnpq.br/7207257431907693 | |
| dc.contributor.advisorID | https://orcid.org/0009-0004-9573-4804 | |
| dc.contributor.advisorLattes | http://lattes.cnpq.br/2822610313018937 | |
| dc.contributor.author | Kieser, Luiza Dal Castel | |
| dc.contributor.authorLattes | http://lattes.cnpq.br/5129723526301022 | |
| dc.contributor.referee1 | Albuquerque, Juliana Guarda de | |
| dc.contributor.referee1ID | https://orcid.org/0000-0003-0764-7424 | |
| dc.contributor.referee1Lattes | http://lattes.cnpq.br/5695066742948762 | |
| dc.contributor.referee2 | Fernandez, João Alberto da Costa Ganzo | |
| dc.contributor.referee2Lattes | http://lattes.cnpq.br/2625173885854048 | |
| dc.date.accessioned | 2026-04-27T12:33:49Z | |
| dc.date.available | 2026-04-27 | |
| dc.date.available | 2026-04-27T12:33:49Z | |
| dc.date.issued | 2024-09-02 | |
| dc.description.abstract | A produtividade indica a eficiência de transformar energia e tempo em produto. Quanto maior a produtividade, mais unidades do produto são feitas em um determinado espaço de tempo. À medida que o sistema construtivo tradicional convencional apresenta uma série de desafios, observa-se a necessidade de mensurar a produtividade em método mais eficientes, com o intuito de verificar a quantidade de tempo e mão de obra gasta na construção de paredes de concreto moldadas in loco, este trabalho tem como objetivo geral quantificar o índice de produtividade de mão de obra da execução de parede de concreto moldado in loco, utilizando formas metálicas em uma obra localizada em Florianópolis, SC. Para tanto, foi escolhido uma obra na cidade de Florianópolis, para a realização do estudo de caso. Com o propósito de identificar maneiras de otimizar a produtividade e identificar os fatores que a afetam, foi aplicado questionário com a equipe de trabalho, observação e medição in loco, computando-se a quantidade da equipe e tempo de execução. Concluiu-se desse modo, que a produtividade não se resume ao aumento do número de trabalhadores alocados às tarefas, uma vez que os dados obtidos no decorrer deste estudo demonstram que a produtividade mais elevada está frequentemente associada a uma gestão eficaz e à organização do trabalho, em vez de apenas ao aumento da mão de obra. Outro aspecto relevante é o layout do canteiro de obras, que quando elaborado de maneira inadequada acaba por gerar movimentações desnecessárias, retrabalhos e perda de tempo, interferindo negativamente na produtividade. | |
| dc.description.abstract | Productivity indicates the efficiency of transforming energy and time into a product. The higher the productivity, the more units of the product are made in a given period. As the traditional construction system presents a series of challenges, and the need to measure productivity using more efficient methods is observed, with the aim of verifying the amount of time and labor spent in the construction of cast-in-place concrete walls, this study aims to present an index for this construction technique using metallic forms. To this end, a construction project in the city of Florianópolis was chosen for the case study. In order to identify ways to optimize productivity and the factors that affect it, a questionnaire was applied to the work team, along with in loco observation and measurement, accounting for the size of the team and the execution time. It is concluded, therefore, that productivity is not limited to increasing the number of workers allocated to tasks, and even though it may seem that more workers would ensure faster execution, the data obtained during this study demonstrate that higher productivity is often associated with effective management and work organization rather than simply increasing the workforce. Another relevant aspect is the layout of the construction site, which, when inadequately designed, generates unnecessary movements, rework, and loss of time, negatively affecting productivity. | |
| dc.identifier.citation | KIESER, Luiza Dal Castel. A produtividade da mão de obra no sistema construtivo de parede de concreto in loco: estudo de caso utilizando forma metálica. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) – Instituto Federal de Santa Catarina, Florianópolis, 2024 | |
| dc.identifier.uri | https://repositorio.ifsc.edu.br/handle/1/1128 | |
| dc.language.iso | Português Brasil | pt_BR |
| dc.publisher | Instituto Federal de Santa Catarina | pt_BR |
| dc.publisher.country | Brasil | pt_BR |
| dc.publisher.department | Florianópolis | pt_BR |
| dc.publisher.initials | IFSC | pt_BR |
| dc.publisher.program | Bacharelado em Engenharia Civil | pt_BR |
| dc.rights.access | Acesso Aberto | |
| dc.subject | Planejamento | |
| dc.subject | Concreto pré-moldado | |
| dc.subject | Produtividade | |
| dc.subject.cnpq | ENGENHARIAS | |
| dc.title | A produtividade da mão de obra no sistema construtivo de parede de concreto in loco: estudo de caso utilizando forma metálica | |
| dc.type | Trabalho de conclusão de graduação | pt_BR |