Aplicação da linha de balanço na programação de obras de um edifício multifamiliar situado na cidade de Florianópolis – SC

dc.contributor.advisorDorneles, Juliana Bonacorso
dc.contributor.advisor-coNardi, Aline Souza Lopes Ventura
dc.contributor.advisor-coIDhttps://orcid.org/0000-0002-9524-7537
dc.contributor.advisor-coLatteshttp://lattes.cnpq.br/4315508654152023
dc.contributor.advisorIDhttps://orcid.org/0009-0004-9573-4804
dc.contributor.advisorLatteshttp://lattes.cnpq.br/2822610313018937
dc.contributor.authorCruz, Matheus Rodrigues
dc.contributor.referee1Fernandez, João Alberto da Costa Ganzo
dc.contributor.referee1Latteshttp://lattes.cnpq.br/2625173885854048
dc.contributor.referee2Beck, Luciana Mota
dc.contributor.referee2Latteshttp://lattes.cnpq.br/7207257431907693
dc.date.accessioned2026-04-27T11:50:57Z
dc.date.available2026-04-27
dc.date.available2026-04-27T11:50:57Z
dc.date.issued2024-09-02
dc.description.abstractDevido à concorrência acirrada no mercado imobiliário, construtoras, administradoras e incorporadoras têm investido cada vez mais na gestão e no planejamento das obras, com o objetivo de reduzir custos e, assim, manter-se no mercado. Este trabalho aplica a técnica de Linha de Balanço (LB) na programação de obras de um edifício multifamiliar, localizado em Florianópolis-SC, composto por nove pavimentos, sendo cinco deles “pavimentos tipo”. A técnica, que se alinha aos princípios do Lean Construction, é conhecida por otimizar o planejamento de obras repetitivas, adotando um ritmo de produção constante (takt-time) e permitindo uma visualização clara do progresso das atividades. Para a implementação desta técnica, foi utilizado o software Prevision, que permitiu a criação da LB, histograma de mão de obra e curva S da obra planejada. A pesquisa iniciou-se com uma análise dos projetos e orçamentos, seguida pela definição da estratégia de execução, dos pacotes de trabalho, escolha dos índices de produtividade e o dimensionamento das equipes e prazos. Posteriormente, foram lançados esses dados no software, para geração da LB, histograma e curva S. Simultaneamente, trabalhou-se no balanceamento dos ritmos das atividades, quando necessário. Os resultados demonstraram que a utilização da LB, aliada a análise das ferramentas gráficas, como a curva S e histograma, contribui para geração de uma programação exequível, garantindo um fluxo constante de trabalho e melhor controle sobre os prazos e recursos.
dc.description.abstractDue to the intense competition in the real estate market, construction companies, management firms, and developers have increasingly invested in project management and planning with the goal of reducing costs and thus staying competitive. This paper applies the Line of Balance (LoB) technique to the scheduling of a multifamily building project in Florianópolis, SC, consisting of nine floors, five of which are typical floors. The technique, which aligns with the principles of Lean Construction, is known for optimizing the planning of repetitive projects by adopting a constant production pace (takt-time) and providing a clear visualization of activity progress. For the implementation of this technique, Prevision software was used, allowing for the creation of the LoB, labor histogram, and S-curve of the planned project. The research began with an analysis of the project plans and budgets, followed by the definition of the execution strategy, work packages, selection of productivity indices, and team and schedule sizing. These data were then entered into the software to generate the LoB, histogram, and S-curve. Simultaneously, the pace of activities was balanced when necessary. The results demonstrated that the use of the LoB, combined with the analysis of graphical tools such as the S- curve and histogram, contributes to the creation of a feasible schedule, ensuring a constant workflow and better control over deadlines and resources.
dc.identifier.citationCRUZ, Matheus Rodrigues. Aplicação da linha de balanço na programação de obras de um edifício multifamiliar situado na cidade de Florianópolis – SC. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) – Instituto Federal de Santa Catarina, Florianópolis, 2024
dc.identifier.urihttps://repositorio.ifsc.edu.br/handle/1/1125
dc.language.isoPortuguês Brasilpt_BR
dc.publisherInstituto Federal de Santa Catarinapt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentFlorianópolispt_BR
dc.publisher.initialsIFSCpt_BR
dc.publisher.programBacharelado em Engenharia Civilpt_BR
dc.rights.accessAcesso Aberto
dc.subjectPlanejamento
dc.subjectGestão de obras
dc.subjectLinha de Balanço (LB)
dc.subject.cnpqENGENHARIAS
dc.titleAplicação da linha de balanço na programação de obras de um edifício multifamiliar situado na cidade de Florianópolis – SC
dc.typeTrabalho de conclusão de graduaçãopt_BR

Arquivos

Pacote Original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
Matheus_Rodrigues_Cruz - TCC.pdf
Tamanho:
9.49 MB
Formato:
Adobe Portable Document Format

Licença do Pacote

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
1.71 KB
Formato:
Item-specific license agreed to upon submission
Descrição: