Proposta de adequação de processo de projeto ao modelo AsBEA: estudo de caso
| dc.contributor.advisor | Dorneles, Juliana Bonacorso | |
| dc.contributor.advisorID | https://orcid.org/0009-0004-9573-4804 | |
| dc.contributor.advisorLattes | http://lattes.cnpq.br/2822610313018937 | |
| dc.contributor.author | Prado, Julia de Maria | |
| dc.contributor.authorLattes | http://lattes.cnpq.br/9410325189458302 | |
| dc.contributor.referee1 | Fernandez, João Alberto da Costa Ganzo | |
| dc.contributor.referee1Lattes | http://lattes.cnpq.br/2625173885854048 | |
| dc.contributor.referee2 | Albuquerque, Juliana Guarda de | |
| dc.contributor.referee2ID | https://orcid.org/0000-0003-0764-7424 | |
| dc.contributor.referee2Lattes | http://lattes.cnpq.br/5695066742948762 | |
| dc.date.accessioned | 2026-06-30T10:52:10Z | |
| dc.date.available | 2026-06-30T10:52:10Z | |
| dc.date.issued | 2021-04-30 | |
| dc.description.abstract | O termo processo de projeto é comumente utilizado no setor fabril para planejamento e gerenciamento da cadeia produtiva de um certo produto, porém, na construção civil ele ainda é considerado um obstáculo, principalmente para as pequenas empresas. A complexidade envolvida no processo de projeto, os prazos curtos, o alto grau de incertezas, a abundância de informações inconsistentes, entre outros, exigem das empresas da construção um alto nível de organização e comunicação. Nesse contexto, partindo da importância do processo de projeto para o sucesso do empreendimento, o objetivo deste trabalho é analisar a rotina de atividades de uma empresa de pequeno porte voltada para projetos de arquitetura. Inicialmente buscou- se estudar por meio da revisão de literatura os modelos de processo de projetos de edifícios mais citados na literatura nacional dentro do meio acadêmico. Após, foi analisada a rotina processual da empresa com intuito de propor adequações para melhoria do processo baseadas no modelo da AsBEA. As melhorias propostas foram: adoção da ferramenta BIM no processo da empresa, formalização da comunicação e registros de informações, análise financeira de investimento por parte do cliente logo nas primeiras fases do processo e a retroalimentação do processo de projeto. | |
| dc.description.abstract | The term "design process" is commonly used in the factory sector to refer to the planning and management of a certain product, however, on civil engineering it is still considred as an ostacle, specially for the small companies. The complexity associated to standardizing a project is added to the frequently short deadlines, highly uncertain scenarios, an abundance of inconsitent informant and many other variables that demand a high level of organization and communication skills from engineering companies. In this context, based on the importance of the desing process for the success of an enterprise, this paper proposes to analyse the routine of activities of a small scale company specialized in architecture design. Firstly, the subject will be studied by the revision of the literature on the models of building design process cited on a national academic level. After that step, the process routine of the local company will be analysed with the aim of proposing enhancements based on the AsBEA model: these include the adoption of the BIM tool in the routine, the implementation of means to formalize communication and register information, the performance of a financial analysis to be done by the client during the initial phases of the process and the feedback for the design process of the Project. | |
| dc.identifier.citation | PRADO, Julia de Maria. Proposta de adequação de processo de projeto ao modelo AsBEA: estudo de caso. 2021. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) – Instituto Federal de Santa Catarina, Florianópolis, 2021 | |
| dc.identifier.uri | https://repositorio.ifsc.edu.br/handle/1/1822 | |
| dc.language.iso | Português Brasil | pt_BR |
| dc.publisher | Instituto Federal de Santa Catarina | pt_BR |
| dc.publisher.country | Brasil | pt_BR |
| dc.publisher.department | Câmpus Florianópolis | pt_BR |
| dc.publisher.initials | IFSC | pt_BR |
| dc.publisher.program | Bacharelado em Engenharia Civil | pt_BR |
| dc.rights.access | Acesso Aberto | |
| dc.subject | Projetos de engenharia | |
| dc.subject | Construção civil | |
| dc.subject | Pequenas e médias empresas | |
| dc.subject.cnpq | ENGENHARIAS | |
| dc.title | Proposta de adequação de processo de projeto ao modelo AsBEA: estudo de caso | |
| dc.type | Trabalho de conclusão de graduação | pt_BR |
